Installing Continental Pro Series
|
Installing Continental Pro Series Chemical Corner –
Chemical Signals – 220v ac – Located in panel on back of machine. These washers use the different segments for the different signals. (Use Posts X5-2àX5-6) I.E. – Post X5-2 is for Prewash, Post X5-3 is for the Use the post labeled X5-1 for supply common (220v ac). Pump Power - Continental does not supply terminals for pulling power for external pumps. You will need to find another source of power when installing Continentals.
Delivery Tubing - should be fixed to the white fittings on the back of the machine. Programming – Pro Series Washers come with the PM or Premier Microprocessor. There are a few varieties of this controller, but they are all fairly similar and straight forward. All Continentals use the segment style to programming. I did a copy/paste from the Continental website below. Find more information about these controls here: http://www.continentalgirbau.com/pro-seriesprogramming Note: You will need to sign up as a member to receive the manuals.
Premier Microprocessor Control |



